R England Ltd, understand the complexities and resources required to produce bills of quantity from the many thousands of drawings that existing in Network Rails design ranges and have invested a significant amount of time creating and updating software to produce OLE BOQ's to support the materials ordering/fabrication process.
Once copies of the design have been supplied, BOQ's can be produced in a number of Microsoft Excel outputs depending on requirements:
- Totals of input assemblies
- Totals of components
- Full breakdown of assemblies by structure
Design ranges OLE BOQ's can produced for are as follows:- OLEMI
- UK1
- MK3
- WCAF
- Series 2
- UK Master Series